
In a world that is constantly evolving, sustainable transport is no longer just a necessity—it is the key to a prosperous future. In this context, we demonstrate that innovation can start here, in the heart of Oltenia, and reach as far as beyond the Arctic Circle.
We are proud to contribute to the modernization of Romania’s railway transport through dedicated projects for CFR Călători, our long-term partner.
In 2024, Softronic marks a quarter-century of activity, continuing Craiova’s tradition in electric locomotive manufacturing.
At the 14th edition of InnoTrans, the world’s largest railway trade fair, we are announcing the upcoming delivery of six new locomotives to railway operators in Romania and Hungary.
Vest Trans Rail has recently acquired its third TransMontana v3.1 locomotive from Softronic Craiova, certified under NNTR for commercial freight service in Romania, Bulgaria, and Hungary.
The new client of Softronic, PSP Cargo Romania, has acquired the TransMontana 080 locomotive.
DB Cargo Romania strengthens its position as one of Softronic’s most important clients in Romania.
Softronic Craiova is delivering TransMontana locomotives 076 (Mb 4019) and 077 (Mb 4020) to Sweden.
TransMontana 075 is the latest locomotive produced and now active in circulation, assigned to the private freight railway operator VTR (Vest Trans Rails).
SOFTRONIC will begin testing the first TransMontana v3.2 locomotive equipped with ETCS Thales.
The LEMA locomotive (Electric Locomotive with Asynchronous Motors), known as TransMontana V3.1 and V3.2, has received the "CE" examination certificate in accordance with the Technical Specification for Interoperability (TSI) – Regulation (EU) 2016/919 of the Commission of May 27, 2016
Constantin Grup is now receiving TransMontana TM 074 from SOFTRONIC, after the locomotive successfully passed both static and route tests.

